Friday, 22 October 2010

22/10/10. Group discussion

We are currently in the process of completing our storyboard.We both completed 30 seconds of the storyboard. One of us doing the first 30 seconds and the other doing the last. We decided that, in order to colabourate our ideas for shots, we would do the remaining 3 minutes of the storyboard together with one person drawing but the other feeding in ideas for shots and working together, just not drawing. We find that this is more effective as we can combine our ideas and decide together on the shots that we really want.

We aim to finnish the storyboard in this lesson and then we will be able to take out the camera for the next week in half term. In this week we are planning to film 2 of the locations on 2 different days. We are going to do the field and street locations as these locations are dependent on weather and may need to be repeated. We will then be able to film the studio location as soon as we are back to school. This should hopefully mean that we will have all of the footage ready promptly after half term and we will be ready to edit. A large part of our ideas will be completed in post-production.

No comments:

Post a Comment